Hi all – Some more work on the layout to pass along. The past couple of
weeks have seen some substantial work completed on the layout in terms of
trackwork and scenery. To me, scenery work makes it seem like the light is in
sight at the end of the tunnel in terms of completing the layout. We have
already achieved a couple major milestones such as finishing the benchwork,
laying track, installing a DCC system and wiring, and establishing operations
on the layout. Now we’re beginning a new phase (scenery), which happens to be
one of my favourite areas of the hobby. To me, scenery takes a layout from the “plywood
prairie” to an actual model of a
railroad. With that in mind, here are a couple photos of our recent progress.
Further work on the track has included painting and ballasting roughly
1/3 of the main line as well as most of the yard. The track was painted with
brown Krylon Camouflage paint which results in a nice (and quick) flat brown
that does a good job of representing prototype colours. Immediately after
painting the excess paint was removed from the railheads with a wooden block
and track cleaner before the paint fully cured. Ballasting the track was
accomplished with Woodland Scenics light grey fine ballast secured by copious
amounts of diluted white glue. Grey ballast was used to represent limestone ballast, something that was relatively common in our area on secondary lines and in yards up until recently (though it can still be seen in some yards such as Brantford or London). CN and CP seemed to favour slag ballast on main lines up until the last few years when hard crushed rock has been used instead. Some areas of the layout will such as the rolling mill and steam servicing area will have black Bachmann ballast to represent cinders/slag roadbed. Progress was temporarily interrupted when we ran
out of ballast, but a trip to Credit Valley in Mississauga remedied that (didn’t
realize how much ballast the yard would take!). Eventually, the track will be weathered once
all the ballasting has taken place and any minor kinks/trouble spots worked
out. Also of note, about half of the mainline curves have superelevated with strips of .020" styrene; I must admit I was skeptical at first of the how noticeable this effect would be when scaled down to HO scale, but after Mark's insistence on the use of superelevation, it does look pretty cool to see a train roll through one of the superelevated curves!
![]() |
| The rails inside of the rolling mill have been powered up; in reality, we probably won't need to move the engine inside the building all that often, but we can if we want to! |
One final note: a special thanks to George Dutka for mentioning my blog on his White Rivier Division blog on 2/26. I hope to someday match his skills in the hobby - thanks George!
Until next time, thanks for stopping by!
Cheers,
Peter.
















